WCS handles federal and provincial EIA processes, including studies, screenings, and reviews, while engaging with advisory committees and community groups. Our services include:
Review technical documents and prepare various EIA documents
Strategic Environmental Assessment for Developmental Planning
Site Collection Studies
Collection & interpretation of baseline data
Assessment and evaluation of environmental impacts
Modeling & reporting of impacts
Development of Environment Management Plan
Supervisory support and presentation to MoEF/PCBs
An environmental management plan is essential for developing, implementing, and monitoring detailed environmental protection measures during and after project commissioning, including associated costs.
Our environmental experts specialize in Environmental Audits and compliance. We assess if goals align with outcomes, providing a comprehensive view of efforts, results, and any deviations.
Land Use and Land Cover mapping is vital for understanding human-environment interactions and the impact of economic activities. Satellite images provide a quick, comprehensive overview of the area.
Understanding traditional rural habitats and designing demonstration units is crucial for large development projects, which often involve resettlement and rehabilitation. Public agency approaches typically overlook the unique physical and sociocultural needs of affected individuals.
Groundwater study examines its interactions with the environment, including occurrence, movement, and quality, while predicting the impact of withdrawal and replenishment on the surrounding area.
Analyze projected traffic with base traffic, assess impacts, recommend mitigation measures, and create a site-specific traffic management plan for control and safe dispersal.
We help clients assess biodiversity impacts, minimize negative effects, ensure compliance with standards, and provide strategic advice for project development.
We analyze blast vibrations from surface mine blasting and predict safe explosive charges to protect surface structures.
We specialize in slope stability assessment, mine bench design, and analyzing the stability of waste dumps and leach piles. WCS offers slope design, instrumentation, remediation, and back-analysis services.
We specialize in water auditing for mining and industrial projects.
Spatial Analysis based on GIS and Remote Sensing
GIS based predictive modeling for impact assessment
GIS based risk assessment and emergency / disaster mitigation plan
GIS based customized environment & risk assessment application software
Form-A (Part-I) Diversion of Forest Land {Section 2(ii)}
Form-B (Part-I) Renewal of Lease on Forest Land
Form-C (Part-I) For seeking Prior Approval for Exploration & Survey
Form –D (Part-I) Signing of Lease (Section 2(iii)) on Forest Land
Form –E (Part-I)
o Re-diversion
o Landuse Change
o Laying of OFC, Slurry/ water pipeline/ Electric cable etc in RoW.
Brief Description of proposal
Land schedule
DGPS survey
Preparation pf plans
Cost benefit analysis.
Rehabilitation Plan.
Compensatory afforestation
Report on type of Forest, Legal status, Density of vegetation, crown density species wise and dia meter wise enumeration of trees.
Report on vulnerability of Forest area to erosion
Report on details and status with reference to location in National Park, Wild life sanctuary, biosphere reserve, tiger reserve, elephant corridor etc.
Report on rare/endangered/unique species of flora and fauna found in the area.
Report on study of alternatives, requirement of land being unavoidable and barest minimum for the project.
Report on Compensatory afforestation including detailed compensatory afforestation scheme with total financial outlay.
Mining plan for major minerals/CMPDI plan with subsidence analysis reports.
Report on non-availability of the same mineral in surrounding area as certified by District Mining Officer.
A report on the all approvals/leases held by the company in the source state along with current status.
Impact of project on land use, permanent or temporary change.
Report on methodology to be followed for prospecting.
Compliance status to approvals received in the past.
Detailed compensatory afforestation scheme.
Preparation of all schemes as per in- principle approval.
Transfer & Mutation of CA land
PF notification
Generation of Challan for Compensatory levies.